FRASER COAST WATER SUPPLY

The links below are to documents produced by the Bligh government looking at water supply.The Mary Basin Water Resource plan contains 150,000MGL of unallocated water which is only to be supplied to SEQ.

WaterReMaryP06

Draft Report Climate Change

Draft Report Rural Water Demand

Draft Report Urban & Industrial Water Demand

Hervey Bay Council Review

SUPPLY OPTIONS

McNamara Water Plan doc 290109 final for release

The link below is to an excel table for calculating supply needed

insert the daily demand for litres per person perday in cell b 2 , then click on cell d 2 for supply required.

HB_water_demand_proj

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s