PARADISE DAM MORE REPAIRS

SUNWATER has listed Paradise Dam as an ‘infrastructure pipeline project’ , which of course has nothing to do with a pipeline.

2 projects are proposed

A. Modifications to the Primary Spillway @$260M

B.Modifications to the Secondary Spillway @$160m

So we the taxpayers of Queensland will now have to spend a further

$420m to stop this labor white elephant from collapsing

because it was designed by expert dam building engineers

who did not believe that we would ever get a flood like the 2013 event

We are so lucky to have such a ‘SMART DAM’ built in the ‘SMART STATE’

by the then “SMART  STATE PREMIER PETER BEATTIE

pages-from-infrastructure_pipeline_report_june_2016

The dam is  ready to spill and the BOM prognosis is for above average rainfall

so more lungfish will be slaughtered on the shredder this summer.

Its really positive that SUNWATER are going to make sure that the dam does not collapse

and hurt the lungfish.

paradise-water-level

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s